Piling continues to north as works commence on 50m pool base (March 2025)
Car park leveling and proof roll (May 2025)
Stripping formwork from 50m pool walls (May 2025)
50 metre pool work in progress
Warm water pool concrete base pour
Precast concrete panels craned into place
50 metre pool is filled for testing
Preparation for the level one floor slab commences
Ground floor reception area commences